Agitators
Centrifuges
Change / Parts House
Degassers / MGS
Desanders
Desilters
Dredged Separation System
Flow Back Systems
Hammer Bar Dump Gate
HDD Mud Systems
Hoppers
Mud Cleaners
Mud Cleaning System
Mud Systems
Oilfield Mud Systems
Pit Pumps
Sand / Silt Separators
Shakers
Suction Valves
Tanks
Thermal Disorption Unit
  Dredge Dewatering Equipment
Oilfield Mud Systems & Equipment
HDD Equipment
Parts & Aftermarket Service

Sign up for Triflo E-news

 
 
 
COIL TUBING MUD SYSTEM


 


A three compartment crimp wall tank measuring 43'Lx8'Wx7'T including two side pump pockets mounted on a Heavy duty three beam, twin axel Rock over trailer 52' 11" with 10' porch, DOT certified, non permit highway legal, total capacity 280BBL.

Equipment:

  • A 6-4 Mud Cleaner mounted over a 126E Triflo Shale Shaker.
  • A Mud mixing hopper with jet complete with bag tray.
  • A mud lab sink.
  • Three 7.5HP Tri-Flo Agitators with XP Motors.
  • Three, 3x4-2500 series, 25HP Centrifugal Pumps, with XP Motors, two mounted in side pockets and one on porch.
  • A 146E Scalping Shale shaker.
  • 24" Mud Gas Separator with hydraulic lay down system and stiff leg to floor.
  • Water supply pump, 7.5HP Centrifugal 2X3 Space saver pump.
  • Mounting bracket pad on front porch to install High pressure choke and manifold.
  • Pit Volume Totalizing system complete with remote display panels.
  • A Low float pump control system in the front tank compartment.
  • 3 Immersion heaters mounted in tank compartments,
    two 8000 & one 3000 watt.
  • Two hydraulic rams mounted in front of tank, to raise front
    trailer for hook up to tractor.
  • A hydraulic power pack to operate the rams and MGS layover system.
  • All necessary plumbing, valves, manifolds are included to meet system requirements.
  • All necessary hand rails, catwalks, grating and ladders, easily stacked, OSHA Compliant.
  • A 3" hydraulic drive submersible pump and flanges hosed to well head, 20' long. Customer to provide hydraulic power to pump.

Electrical:

  • A NEMA Explosion proof electrical system, OSHA Compliant, with central control panel
  • 3 Explosion proof, telescoping flood lights setup for single man operation.

Paint:

  • Standard Triflo three step paint system: sand blast, primer and Urethane finish coat.